Art

CST tops $3B cost savings

The work of the 31st Contracting Squadron at Aviano Air Base, Italy, contributed the Cost Savings Tracker entry that put the Department of the Air Force over the $3 billion cost savings milestone. The squadron's $70.8 million cost savings was the result of a Viper kits contract that not only helped solve a mission problem but led to decentralized ordering as well. (U.S. Air Force graphic illustration).

PHOTO BY: U.S. Air Force
VIRIN: 221208-F-ZZ988-300.PNG
FULL SIZE: 3.16 MB
Additional Details

No camera details available.

IMAGE IS PUBLIC DOMAIN

Read More

This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at https://www.dimoc.mil/resources/limitations, which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.

JPG    PNG   ABOUT